PlumbingBeginnerLiquid Fuels

Fuel-Oil Day-Tank Runtime Calculator

Calculate constant-demand runtime from tank volume, usable fraction, reserve fraction, and fuel demand.

Why it matters: A transparent formula keeps the user-entered hydraulic, gas, or storage basis available for technical review.

User inputs

Enter field measurements

5 inputs
Select I-P or SI units for the entire input set.
gal or LNominal tank volume.
0–1Maximum usable fraction.
0–1Fraction held below normal usable range.
gal/h or L/hRepresentative consumption rate.

Calculated result

Engineering evaluation

Calculation complete—verify project criteria
Fuel day-tank runtime (t_f)17.5 h
Available fuel volume (V_a)
350 gal

Engineering interpretation

The entered usable range above reserve supports 17.5 hours at constant demand.

Important limitations

  • Constant-consumption inventory screen only. Transfer-pump operation, return flow, expansion, low-level controls, code volume, fire protection, spill containment, and emergency reserve policy are separate.

Engineering knowledge center

Understand the calculation—not just the answer

2026-08-07 · Free Library
Governing relationships
V_a=V_t(F_u−F_r)
t_f=V_a/q_f
Current substitution

V_a=500×(0.9−0.2)=350; t_f=350/20=17.5 h.

Calculation sequence

Step-by-step method

  1. Confirm the calculation boundary, units, and source of every input.
  2. Apply the displayed equation to the entered values.
  3. Review the result against governing criteria and documented uncertainty.

Equation legend

Inputs and calculated quantities

V_t
Tank volume — gal or L
F_u
Usable volume fraction — 0–1
F_r
Reserved volume fraction — 0–1
q_f
Constant fuel demand — gal/h or L/h
t_f
Fuel day-tank runtime — h
V_a
Available fuel volume — gal

Engineering calculation disclaimer

These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.

Read the full use and limitation statement