235 free engineering calculators

Find the calculation behind the field question.

Search the complete reviewed SVE Group Free library by discipline, system, topic, or level. Every tool includes equations, substitution, interpretation, warnings, limitations, and source notes.

Showing 235 of 235 calculators

MechanicalIntermediate

Fans and Air Systems

Fan Affinity Laws

Estimate how fan airflow, pressure, and shaft power change with rotational speed when fan geometry and air density remain similar.

MechanicalIntermediate

Pumps and Hydronics

Pump Affinity Laws

Estimate pump flow, head, and shaft power at a different rotational speed for the same impeller and a similar system.

MechanicalIntermediate

Duct Systems

Equivalent Round Duct

Estimate the round duct diameter with approximately the same friction rate as a rectangular duct at equal airflow.

MechanicalAdvanced

Hydronic Piping

Hydronic Pressure Loss

Estimate straight-pipe and minor pressure losses with Darcy–Weisbach using actual fluid properties and a summed fitting-loss coefficient.

MechanicalIntermediate

Heat Transfer

Airside Sensible Heat

Estimate sensible airside capacity from airflow, dry-bulb temperature difference, air density, and specific heat.

ElectricalBeginner

Electrical Fundamentals

Ohm’s Law

Solve the basic resistive relationship among voltage, current, resistance, and power.

ElectricalIntermediate

Electrical Fundamentals

Three-Phase Power

Calculate balanced three-phase real, apparent, and reactive power from line voltage, line current, and true power factor.

ElectricalIntermediate

Conductors and Circuits

Voltage Drop

Estimate single-phase or balanced three-phase voltage drop using a transparent conductor reference, resistance-only estimate, or project-specific AC impedance data.

ElectricalIntermediate

Motors and Drives

Motor Loading

Estimate shaft loading from measured true input power, estimated operating efficiency, and motor nameplate output rating.

PlumbingBeginner

Domestic Hot Water

Hot-Water Mixing

Calculate ideal hot- and cold-water flow fractions required to produce a selected mixed-water temperature.

CommissioningBeginner

Field Evaluation

Percent of Design

Compare a measured value with its scheduled or design value and evaluate the result against a user-entered tolerance.

CommissioningIntermediate

Electrical

Transformer Loading

Calculate measured apparent power and percent transformer loading from voltage, current, and phase configuration.

CommissioningBeginner

Cross-Discipline Analysis

Data Averaging

Calculate the arithmetic mean, minimum, maximum, and range for five entered readings.

CommissioningBeginner

Cross-Discipline Energy

Energy Cost

Estimate energy use and consumption cost from power, operating hours, load factor, and an entered energy rate.

MechanicalIntermediate

Fans

Fan Turndown

Calculate fan flow turndown, minimum-flow percentage, speed ratio, and ideal affinity-law power fraction.

MechanicalAdvanced

Pumps

Pump Total Dynamic Head

Calculate pump total dynamic head from pressure, elevation, and velocity-head differences between suction and discharge measurement planes.

MechanicalAdvanced

Pumps

NPSH Available

Estimate source-boundary net positive suction head available from absolute liquid-surface pressure, vapor pressure, static suction head, and suction-line losses.

MechanicalIntermediate

Hydronics

Hydronic Fill Pressure

Calculate minimum cold fill pressure from elevation, fluid specific gravity, and required pressure at the system high point.

MechanicalIntermediate

Hydronics

Valve Authority

Calculate control-valve authority from valve pressure drop and the pressure drop of the remaining controlled circuit.

MechanicalIntermediate

Pumps

Pump Power and Energy

Estimate pump electrical input power, operating energy, and energy-consumption cost from flow, head, efficiencies, and runtime.

MechanicalIntermediate

Duct Systems

Equal-Friction Duct

Estimate round duct diameter from airflow and target friction rate using a standard-air empirical relationship.

MechanicalAdvanced

Duct Systems

Duct Pressure Loss

Calculate straight-duct pressure loss with Darcy–Weisbach from hydraulic diameter, length, velocity, air density, and friction factor.

MechanicalIntermediate

Air Measurement

Pitot-Tube Airflow

Calculate air velocity and airflow from average velocity pressure, air density, and clear duct area.

MechanicalAdvanced

Hydronic Piping

Darcy–Weisbach Pipe Loss

Calculate liquid velocity, Reynolds number, Darcy friction factor, and straight-pipe pressure loss from actual fluid and pipe properties.

MechanicalIntermediate

Hydronic Controls

Control-Valve Cv

Calculate required liquid valve flow coefficient Cv from flow, pressure drop, and specific gravity.

MechanicalIntermediate

Hydronic Piping

Glycol Correction

Estimate required glycol-solution flow for the same heat duty and temperature difference from entered fluid density and specific heat.

MechanicalBeginner

Loads

Required Airflow

Calculate airflow required for a sensible load using temperature difference and a user-entered air constant.

MechanicalIntermediate

Central Plant

Chiller Capacity

Calculate evaporator capacity from liquid flow, density, specific heat, and entering/leaving temperature.

MechanicalAdvanced

Psychrometrics

Psychrometric Properties

Calculate humidity ratio, moist-air enthalpy, dew point, and vapor pressure from dry-bulb temperature, relative humidity, and pressure.

MechanicalAdvanced

Psychrometrics

Mixed-Air Conditions

Calculate mixed-air dry-bulb temperature, humidity ratio, and enthalpy from outdoor and return moist-air states.

MechanicalIntermediate

Psychrometrics

Dew Point

Estimate air dew-point temperature from dry-bulb temperature and relative humidity.

MechanicalAdvanced

Equipment

AHU Performance

Calculate measured air-handler total-capacity magnitude, heat-transfer direction, and percent of entered design capacity from airflow and moist-air enthalpy difference.

ElectricalIntermediate

Electrical Fundamentals

AC Power Triangle

Reconcile signed real and reactive power into apparent power, power-factor magnitude, and power angle.

ElectricalIntermediate

Standby Power and Batteries

UPS Battery Runtime

Estimate ideal usable runtime from nominal DC energy, usable depth, conversion efficiency, and constant AC load.

ElectricalIntermediate

Standby Power and Batteries

Battery Capacity

Calculate ideal minimum amp-hour capacity for a constant AC load and required runtime.

ElectricalBeginner

Energy and Demand

Demand Charge

Estimate simple demand charges from a user-entered billing demand, rate, and number of periods.

ElectricalAdvanced

Metering and Instrumentation

CT/PT Meter Scaling

Calculate CT ratio, PT ratio, combined multiplier, and primary power or energy from an unscaled secondary reading.

ElectricalIntermediate

Metering and Instrumentation

Meter Pulse Energy

Convert counted meter pulses with a Wh-per-pulse constant into interval energy and average demand.

PlumbingBeginner

Load Inventory

Fixture-Unit Summation

Sum user-entered fixture counts and fixture-unit values without embedding a code table or converting the total to probable demand.

PlumbingIntermediate

Domestic Hot Water Recirculation

Recirculation Flow

Calculate steady recirculation flow required to carry a user-entered loop heat loss at an allowable temperature drop.

PlumbingBeginner

Domestic Hot Water Field Verification

Hot-Water Delivery Time

Estimate ideal pipe displacement volume and delivery time from internal diameter, developed length, and fixture flow.

PlumbingIntermediate

Storm Drainage

Roof Drainage Flow

Convert tributary roof area and user-entered rainfall intensity into runoff flow before code-based drain sizing.

PlumbingIntermediate

Site and Storm Drainage

Rational Runoff

Estimate peak runoff from user-entered area, rainfall intensity, and runoff coefficient.

PlumbingIntermediate

Natural and Fuel Gas

Fuel-Gas Load and Flow

Sum user-entered appliance loads and convert diversified load to ideal gas volume flow using a user-entered heating value.

PlumbingAdvanced

Domestic Water Pressure

Booster Pressure

Calculate preliminary booster pressure from supply pressure, required residual pressure, elevation, losses, and a visible user-entered margin.

PlumbingAdvanced

Domestic Water Pressure

PRV Setpoint

Calculate a preliminary PRV setpoint for an upper outlet and the resulting lower static-pressure screen.

PlumbingAdvanced

Sump and Drainage Pumps

Sump-Basin Cycling

Estimate working drawdown volume, pump-on time, refill time, and starts per hour for a constant-area basin.

PlumbingAdvanced

Domestic Hot Water Field Verification

Water-Heater Capacity Test

Calculate measured water-heating output, direct operating efficiency, and output relative to a user-entered schedule.

PlumbingAdvanced

Pump Field Verification

Plumbing-Pump Field Test

Combine measured flow, suction/discharge pressure, gauge elevation, specific gravity, and electrical input into a pump performance screen.

PlumbingAdvanced

Domestic Water Pressure

Water Loss Budget

Calculate the pressure allowance remaining for distributed pipe friction along a critical domestic-water path.

PlumbingAdvanced

Domestic Water Piping

Hazen–Williams Flow

Invert the Hazen–Williams relationship to estimate flow from diameter, length, C-factor, and available friction head.

PlumbingBeginner

Water-System Field Work

Pipe Flush Time

Calculate contained circular-pipe volume and ideal duration for a user-entered number of volume exchanges.

PlumbingIntermediate

Domestic Water Devices

Meter Loss Scaling

Scale a documented meter pressure-loss point to another flow using a visible user-entered exponent.

PlumbingAdvanced

Closed Water Systems

Tank Acceptance

Estimate ideal tank acceptance between initial and maximum gauge pressures using absolute-pressure gas relationships.

PlumbingAdvanced

Pressure Transients

Water-Hammer Surge

Apply the ideal Joukowsky relationship to a user-entered density, wave speed, and signed velocity change.

PlumbingBeginner

Pressure Regulation

PRV Reduction

Calculate pressure drop, percent reduction, and inlet-to-outlet ratio for a documented PRV condition.

PlumbingBeginner

Domestic Hot Water

Draw Energy

Calculate ideal useful energy added to a documented hot-water draw volume.

PlumbingAdvanced

Domestic Hot Water Field Verification

Heater Standby Loss

Subtract useful delivered-water energy from measured input over a defined test boundary and duration.

PlumbingIntermediate

Domestic Hot Water Recirculation

Recirculation Pump Head

Calculate signed pump head from suction/discharge pressures, gauge elevation difference, and fluid specific gravity.

PlumbingBeginner

Specialty Plumbing

Trap-Primer Demand

Calculate daily primer-water volume and water per design event from user-entered dose and schedule values.

PlumbingIntermediate

Medical and Specialty Gas

Cylinder-Bank Duration

Calculate ideal constant-demand duration from cylinder count, standard gas volume, and a user-entered usable fraction.

PlumbingIntermediate

Water Reuse

Greywater Balance

Compare treated usable daily collection with nonpotable demand using a visible treatment-recovery factor.

PlumbingIntermediate

Specialty Drainage

Interceptor Retention

Calculate ideal hydraulic retention time from operating volume, effective-volume fraction, and constant peak flow.

PlumbingIntermediate

Roof Drainage

Roof Drain Area

Invert the roof-runoff relationship to screen tributary area from documented drain flow capacity and rainfall.

PlumbingIntermediate

Fuel Gas

Combustion Air

Apply a visible user-entered air rate per heat input and design factor; no code rate is embedded.

PlumbingAdvanced

Compressed Air

Air Leak Rate

Estimate ideal standard-air leak rate from isolated volume, gauge-pressure decay, atmosphere, and elapsed time.

PlumbingBeginner

Liquid Fuels

Day-Tank Runtime

Calculate constant-demand runtime from tank volume, usable fraction, reserve fraction, and fuel demand.

PlumbingAdvanced

Fuel Gas Field Work

Gas-Pipe Purge Time

Calculate straight-pipe contained volume and ideal time for user-entered purge volume exchanges and flow.

PlumbingIntermediate

Medical and Specialty Gas

Gas-Pipe Velocity

Calculate mean pipe velocity from actual volumetric flow at pipe conditions and actual internal diameter.

CommissioningBeginner

Acceptance Arithmetic

Acceptance Band

Convert a target and user-entered percent tolerance into lower and upper arithmetic endpoints.

CommissioningIntermediate

Acceptance Arithmetic

Multi-Point Tolerance

Calculate three signed deviations, worst deviation, and count within a visible user-entered tolerance.

CommissioningBeginner

Data Reduction

Root Sum Square

Combine four orthogonal or independent magnitude components by root-sum-square arithmetic.

CommissioningBeginner

Trend Analysis

Percent Change

Calculate signed absolute and percent change relative to the magnitude of a nonzero initial value.

CommissioningIntermediate

Trend Analysis

Three-Point Trend

Calculate the least-squares slope for three equally spaced values and the fitted middle value.

CommissioningBeginner

Runtime and Cycling

Duty Cycle

Calculate on-time percentage and off time over a documented observation interval.

CommissioningBeginner

Runtime and Cycling

Cycle Rate

Calculate cycles per hour and mean minutes per cycle from count and observation duration.

CommissioningIntermediate

Controls Verification

Response Latency

Calculate clock-corrected latency from command and response timestamps and a signed offset correction.

CommissioningBeginner

Commissioning Management

Completion Forecast

Forecast remaining time from completed items, total items, and elapsed time at the observed average production rate.

CommissioningBeginner

Pipe Layout

Pipe Cut Length

Subtract two fitting takeouts from center-to-center length and add a visible signed cut allowance.

CommissioningBeginner

Electrical Field Quantities

Wire-Pull Length

Add horizontal and vertical route, visible slack percentage, and two termination allowances.

CommissioningIntermediate

Electrical Field Quantities

Conduit Fill

Calculate cable-area fill and compare it only with a visible user-entered criterion; no code table is embedded.

CommissioningIntermediate

Electrical Field Quantities

Tray Width Utilization

Calculate single-layer cable-width utilization from user-entered cable widths and usable tray width.

CommissioningBeginner

Supports and Layout

Hanger Count

Calculate arithmetic support count from effective run length, maximum spacing, and equal end offsets.

CommissioningBeginner

Supports and Layout

Support Spacing

Calculate equal interval spacing from supported length and a whole-number support count.

CommissioningAdvanced

Equipment Curves

Curve Interpolation

Evaluate the quadratic passing through three distinct user-entered curve points by Lagrange interpolation.