Calculate runtime percentage, runtime hours, and starts per hour from evenly sampled trend data.
Why it matters: Runtime and cycling metrics help identify short cycling, unstable control, excessive wear, and operational mismatch.
ΣCALCULATE · VERIFY · INTERPRET
Calculated result
Engineering evaluation
Within entered screening criteria
Runtime percentage (RP)50 %
Calculated runtime (RH)
12 h
Starts per hour (C)
0.5 starts/h
Engineering interpretation
The trend indicates 50% runtime (12 h) and 0.5 starts per hour. Review sampling interval, missing data, command versus proof status, and the entered equipment-specific cycling limit.
Engineering knowledge center
Understand the calculation—not just the answer
2026-08-07 · Free Library
Governing relationships
RP = Non/N×100
RH = H(Non/N)
C = Ns/H
within entered cycling criterion when C ≤ L
Current substitution
RP = 720/1440×100 = 50%; RH = 24(720/1440) = 12 h; C = 12/24 = 0.5 starts/h.
Calculation sequence
Step-by-step method
Confirm even sampling and valid binary state values.
Divide ON samples by total valid samples.
Count OFF-to-ON transitions and divide by represented hours.
Equation legend
Inputs and calculated quantities
H
Trend period — h
Non
Samples in ON state — samples
N
Total samples — samples
Ns
Counted starts — starts
L
Entered cycling limit — starts/h
RP
Runtime percentage — %
RH
Calculated runtime — h
C
Starts per hour — starts/h
Applications
How this calculation is used
Building design
Define expected runtime and cycling review criteria.
Construction
Evaluate startup and controls-trend behavior.
Commissioning
Reduce binary trend samples and counted starts into repeatable operating metrics.
Quality controls
Assumptions and limitations
Assumptions
Entered values represent the same stable operating condition.
Measurements and reference values use consistent units and boundaries.
Limitations
This is a screening and field-verification tool, not an automatic acceptance decision.
These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.