MechanicalBeginnerControls

Actuator Stroke-Time Calculator

Normalize a measured partial actuator movement to an equivalent full-stroke time and compare it with rated time.

Why it matters: Stroke time affects sequence timing, stability, safety response, and economizer operation.

User inputs

Enter field measurements

5 inputs
Select I-P or SI units. Unit-dependent entries are converted when the selection changes.
%Verified percent of full actuator stroke.
sMeasured time for the entered travel.
sManufacturer rated full-stroke time at the stated conditions.
%User-entered project or manufacturer screening criterion.

Calculated result

Engineering evaluation

Entered stroke-time criterion met
Equivalent full-stroke time (tf)90 s
Deviation from rated stroke time (δt)
0 %

Engineering interpretation

The measured movement corresponds to 90 s full stroke, 0% relative to the entered rating and 20% screening tolerance.

Important limitations

  • Stroke time varies with load, torque, pressure differential, spring return, power supply, control signal, linkage, and endpoint definition.

Engineering knowledge center

Understand the calculation—not just the answer

2026-08-07 · Free Library
Governing relationships
tf = t·100/X
δt = (tf−tr)/tr×100
compare |δt| with Tol
Current substitution

tf = 90×100/100 = 90 s; δt = (90−90)/90×100 = 0%; Tol = 20%.

Calculation sequence

Step-by-step method

  1. Confirm actual verified travel percentage.
  2. Normalize elapsed time to a full stroke.
  3. Compare absolute deviation with the user-entered screening tolerance.

Equation legend

Inputs and calculated quantities

X
Verified travel — %
t
Measured elapsed time — s
tr
Rated full-stroke time — s
Tol
Entered allowable stroke-time deviation — %
tf
Equivalent full-stroke time — s
δt
Deviation from rated stroke time — %

Engineering calculation disclaimer

These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.

Read the full use and limitation statement