Calculated result
Engineering evaluation Entered stroke-time criterion met Equivalent full-stroke time (tf) 90 s
Deviation from rated stroke time (δt) 0 % Engineering interpretation The measured movement corresponds to 90 s full stroke, 0% relative to the entered rating and 20% screening tolerance.
Important limitations Stroke time varies with load, torque, pressure differential, spring return, power supply, control signal, linkage, and endpoint definition. Copy results Open printable PDF Download PDF
Report a calculation concern
Engineering knowledge center
Understand the calculation—not just the answer 2026-08-07 · Free Library Equations & method Engineering guide Reference data & sources
Governing relationships tf = t·100/X
δt = (tf−tr)/tr×100
compare |δt| with Tol
Current substitution tf = 90×100/100 = 90 s; δt = (90−90)/90×100 = 0%; Tol = 20%.
Calculation sequence
Step-by-step method Confirm actual verified travel percentage. Normalize elapsed time to a full stroke. Compare absolute deviation with the user-entered screening tolerance. Equation legend
Inputs and calculated quantities
X Verified travel — %
t Measured elapsed time — s
tr Rated full-stroke time — s
Tol Entered allowable stroke-time deviation — %
tf Equivalent full-stroke time — s
δt Deviation from rated stroke time — % Applications
How this calculation is used Building design Document required actuator timing.
Construction Check linkage, feedback, and power supply.
Commissioning Calculate equivalent full-stroke time from a verified partial or full movement.
Quality controls
Assumptions and limitations Assumptions Entered data describe one stable operating condition and use consistent measurement boundaries. Time, energy, and performance values are representative of the stated interval. Limitations This is a preliminary evaluation and commissioning-support tool, not an automatic acceptance determination. Project sequences, manufacturer data, tariffs, codes, and professional review remain controlling. Field use
Verification procedure Confirm the operating mode, test boundary, and instrument calibration. Collect simultaneous readings or a documented trend interval. Compare the result with the approved sequence, submittal, and project criteria. Common engineering mistakes Combining measurements from different operating modes or time intervals. Ignoring sensor uncertainty, trend sampling, or the defined equipment boundary. Technical basis
References and source standards Need project-specific support?
Work with SVE Group Use this free tool for preliminary evaluation and field support. For project requirements, system analysis, commissioning, or engineering services, connect with SVE Group.
Visit SVE Group Contact the firm Engineering calculation disclaimer These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.
Read the full use and limitation statement