Calculation sequence
Step-by-step method
- Calculate step magnitude and peak overshoot.
- Calculate time from step to peak and settling.
- Compare overshoot and absolute final error with the user-entered screening criteria.
Calculate percent overshoot, peak time, settling time, and final error for a documented control response.
Why it matters: Response metrics help distinguish stable control from excessive overshoot, slow settling, or offset.
Calculated result
The documented response has 10% overshoot, 30 s peak time, 120 s settling time, and final error 1 process units. Entered criteria are 10% overshoot and 2 process units final error.
Engineering knowledge center
OS = (110−100)/|100−0|×100 = 10%; tpd = 30 s; tsd = 120 s; e = 1; OStol = 10%; etol = 2.
Calculation sequence
Equation legend
Applications
Define control-response expectations.
Check trend sampling and tuning implementation.
Quantify a recorded step response against user-entered screening criteria without automatically assigning project acceptance.
Quality controls
Field use
Technical basis
These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.
Read the full use and limitation statement