MechanicalIntermediatePsychrometrics

Condensate Generation Calculator

Calculate airside condensate generation from dry-air mass flow and humidity-ratio decrease.

Why it matters: Condensate rate supports drain, pan, pump, and field-performance evaluation.

User inputs

Enter field measurements

5 inputs
Select I-P or SI units. Unit-dependent entries are converted when the selection changes.
cfm or m³/sRepresentative airflow.
lb/ft³ or kg/m³Representative dry-air density.
lb/lb or kg/kgEntering moisture per unit dry air.
lb/lb or kg/kgLeaving moisture per unit dry air.

Calculated result

Engineering evaluation

Calculation complete
Estimated condensate generation (ṁc)180 lb/h
Dry-air mass flow (ṁda)
45,000 lb/h
Humidity-ratio decrease (ΔW)
0.004 kg/kg dry air

Engineering interpretation

The entered dehumidification condition produces approximately 180 lb/h condensate.

Important limitations

  • Drain sizing must consider transient peaks, carryover, cleaning, pan geometry, trap pressure, lift, safety factors, and local requirements.

Engineering knowledge center

Understand the calculation—not just the answer

2026-08-07 · Free Library
Governing relationships
ṁda = ρQ×60
ΔW = W1−W2
ṁc = ṁda·ΔW
Current substitution

ṁda = 45000; ΔW = 0.012−0.008 = 0.004; ṁc = 180 lb/h.

Calculation sequence

Step-by-step method

  1. Calculate dry-air mass flow.
  2. Subtract leaving from entering humidity ratio.
  3. Multiply dry-air mass flow by humidity-ratio decrease.

Equation legend

Inputs and calculated quantities

Q
Dry-air volumetric flow — cfm or m³/s
ρ
Dry-air density — lb/ft³ or kg/m³
W1
Entering humidity ratio — lb/lb or kg/kg
W2
Leaving humidity ratio — lb/lb or kg/kg
ṁc
Estimated condensate generation — lb/h
ṁda
Dry-air mass flow — lb/h
ΔW
Humidity-ratio decrease — kg/kg dry air

Engineering calculation disclaimer

These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.

Read the full use and limitation statement