Multiply dry-air mass flow by humidity-ratio increase.
Equation legend
Inputs and calculated quantities
Q
Dry-air volumetric flow — cfm or m³/s
ρ
Dry-air density — lb/ft³ or kg/m³
W1
Entering humidity ratio — lb/lb or kg/kg
W2
Target humidity ratio — lb/lb or kg/kg
ṁw
Required moisture addition — lb/h
ṁda
Dry-air mass flow — lb/h
ΔW
Humidity-ratio increase — kg/kg dry air
Applications
How this calculation is used
Building design
Screen humidifier capacity.
Construction
Check equipment and distribution capacity against air conditions.
Commissioning
Estimate moisture demand at a documented airflow and humidity-ratio change.
Quality controls
Assumptions and limitations
Assumptions
Entered values represent one stable operating condition and use consistent measurement boundaries.
Fluid and air properties are representative of the evaluated condition.
Limitations
This is a preliminary evaluation and field-verification tool, not a final sizing or code-compliance determination.
Manufacturer data, adopted codes, project criteria, and professional engineering review remain controlling.
Field use
Verification procedure
Confirm measurement boundaries, operating mode, and instrument calibration.
Stabilize the system and record simultaneous readings.
Compare the calculation with project requirements and manufacturer data before disposition.
Common engineering mistakes
Mixing values from different operating conditions.
Using nominal rather than measured flow, temperature, power, or fluid properties.
Technical basis
References and source standards
ASHRAE Handbook—FundamentalsPsychrometrics, heat transfer, load relationships, and HVAC calculation context; verify the licensed current edition during professional review.
These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.