Calculated result
Engineering evaluation Screening estimate—demand and TOU excluded Estimated blended-energy runtime cost (C) 4,800 currency (energy only)
Electrical energy (E) 40,000 kWh Engineering interpretation The entered runtime represents 40000 kWh and an estimated blended-energy cost of 4800 currency units.
Important limitations Demand, time-of-use, minimum, tax, and other tariff charges are not included unless embedded in the entered rate. Copy results Open printable PDF Download PDF
Report a calculation concern
Engineering knowledge center
Understand the calculation—not just the answer 2026-08-07 · Free Library Equations & method Engineering guide Reference data & sources
Current substitution E = 20×2000 = 40000 kWh; C = 40000×0.12 = 4800.
Calculation sequence
Step-by-step method Multiply equipment input power by runtime. Multiply electrical energy by the entered blended energy rate. Report the screening energy-only interval cost. Equation legend
Inputs and calculated quantities
P Equipment input power — kW
t Runtime — h
R Blended energy rate — currency/kWh
C Estimated blended-energy runtime cost — currency (energy only)
E Electrical energy — kWh Applications
How this calculation is used Building design Screen expected operating cost.
Construction Check power and status monitoring.
Commissioning Calculate cost for a documented equipment operating interval.
Quality controls
Assumptions and limitations Assumptions Entered data describe one stable operating condition and use consistent measurement boundaries. Time, energy, and performance values are representative of the stated interval. Limitations This is a preliminary evaluation and commissioning-support tool, not an automatic acceptance determination. Project sequences, manufacturer data, tariffs, codes, and professional review remain controlling. Field use
Verification procedure Confirm the operating mode, test boundary, and instrument calibration. Collect simultaneous readings or a documented trend interval. Compare the result with the approved sequence, submittal, and project criteria. Common engineering mistakes Combining measurements from different operating modes or time intervals. Ignoring sensor uncertainty, trend sampling, or the defined equipment boundary. Technical basis
References and source standards Need project-specific support?
Work with SVE Group Use this free tool for preliminary evaluation and field support. For project requirements, system analysis, commissioning, or engineering services, connect with SVE Group.
Visit SVE Group Contact the firm Engineering calculation disclaimer These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.
Read the full use and limitation statement