Estimate energy use and consumption cost from power, operating hours, load factor, and an entered energy rate.
Why it matters: Energy-cost screening should keep entered tariff assumptions separate from measured equipment performance.
ΣCALCULATE · VERIFY · INTERPRET
Calculated result
Engineering evaluation
Screening estimate complete
Estimated energy-consumption cost (K)18,000 $
Average operating power (Pavg)
75 kW
Estimated energy use (E)
150,000 kWh
Engineering interpretation
Estimated consumption is 150000 kWh at an energy cost of $18000. This screen excludes demand charges, fixed fees, taxes, ratchets, time-of-use periods, and escalation unless embedded in the entered rate.
Important limitations
Use the applicable utility tariff or marginal rate for decision-making; a blended bill rate may not represent avoided cost.
Engineering knowledge center
Understand the calculation—not just the answer
2026-08-07 · Free Library
Governing relationships
Pavg = P(LF/100)
E = Pavg H
K = EC
Current substitution
Pavg = 100(75/100) = 75 kW; E = 75×2000 = 150000 kWh; K = 150000×0.12 = $18000.
Calculation sequence
Step-by-step method
Multiply entered power by average load factor.
Multiply average power by operating hours.
Multiply energy use by the entered energy rate.
Equation legend
Inputs and calculated quantities
P
Connected or measured power — kW
H
Operating hours — h
LF
Average load factor — %
C
Energy rate — $/kWh
K
Estimated energy-consumption cost — $
Pavg
Average operating power — kW
E
Estimated energy use — kWh
Applications
How this calculation is used
Building design
Compare preliminary operating-cost scenarios.
Construction
Estimate the cost implication of schedules or temporary operation.
Commissioning
Translate verified power and runtime into a transparent consumption-cost estimate.
Quality controls
Assumptions and limitations
Assumptions
Entered values represent the same stable operating condition.
Measurements and reference values use consistent units and boundaries.
Limitations
This is a screening and field-verification tool, not an automatic acceptance decision.
These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.