Calculate simple payback from net initial cost and annual net savings.
Why it matters: Simple payback is easy to communicate but omits time value, escalation, financing, taxes, and savings degradation.
ΣCALCULATE · VERIFY · INTERPRET
Calculated result
Engineering evaluation
Within entered screening criteria
Simple payback period (Y)4.091 years
Net initial cost (Cn)
45,000 $
Annual net savings (Sn)
11,000 $/year
Engineering interpretation
The simple payback is 4.091 years based on $45000 net initial cost and $11000 annual net savings, compared with the entered 5-year maximum. Use life-cycle cost analysis for decisions affected by time value, escalation, financing, taxes, residual value, or savings degradation.
Important limitations
The status color reflects only the user-entered maximum payback period. SVE Group does not impose a universal payback acceptance threshold.
Engineering knowledge center
Understand the calculation—not just the answer
2026-08-07 · Free Library
Governing relationships
Cn = I−R
Sn = S−M
Y = Cn/Sn
within entered criterion when Y ≤ Ymax
Current substitution
Cn = 50000−5000 = $45000; Sn = 12000−1000 = $11000/year; Y = 4.091 years.
Calculation sequence
Step-by-step method
Subtract confirmed incentives from initial installed cost.
Subtract added annual maintenance from gross annual savings.
Divide net initial cost by annual net savings.
Equation legend
Inputs and calculated quantities
I
Initial installed cost — $
R
Incentive or rebate — $
S
Annual gross savings — $/year
M
Added annual maintenance — $/year
Ymax
Entered maximum payback period — years
Y
Simple payback period — years
Cn
Net initial cost — $
Sn
Annual net savings — $/year
Applications
How this calculation is used
Building design
Screen alternatives before life-cycle cost analysis.
Construction
Compare simple change-order cost and annual savings assumptions.
Commissioning
Screen implementation opportunities identified through testing or retro-commissioning.
Quality controls
Assumptions and limitations
Assumptions
Entered values represent the same stable operating condition.
Measurements and reference values use consistent units and boundaries.
Limitations
This is a screening and field-verification tool, not an automatic acceptance decision.
These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.