CommissioningIntermediateTrend Analysis

Three-Point Trend-Slope Calculator

Calculate the least-squares slope for three equally spaced values and the fitted middle value.

Why it matters: Transparent data reduction keeps raw values, criteria, symbols, and arithmetic available for review.

User inputs

Enter field measurements

6 inputs
The selected system is recorded with the calculation; these data-reduction equations are unit-neutral.
Enter the common unit label for the values, such as °F, psi, cfm, gpm, kW, or °C.
selected unitsSample at time zero.
selected unitsSample at one interval.
selected unitsSample at two intervals.
minEqual interval between samples.

Calculated result

Engineering evaluation

Calculation complete—verify project criteria
Three-point least-squares trend slope (m)1.2 units/min
Fitted value at middle sample (b)
15.667 units

Engineering interpretation

The equally spaced three-point trend changes at 1.2 units/min.

Important limitations

  • Data-reduction screen only. Project requirements, test procedure, instrument uncertainty, sampling, and authorized engineering judgment remain controlling.

Engineering knowledge center

Understand the calculation—not just the answer

2026-08-07 · Free Library
Governing relationships
For t=[0,Δt,2Δt], m=(X_3−X_1)/(2Δt)
b=X̄
displayed symbols: X_2
Current substitution

m=(22−10)/(2×5)=1.2; b=15.66667.

Calculation sequence

Step-by-step method

  1. Confirm the measurement boundary, time basis, and formula symbols.
  2. Apply the displayed equation to the user-entered values.
  3. Review data quality, uncertainty, project criteria, and professional disposition.

Equation legend

Inputs and calculated quantities

X_1
First sample — selected units
X_2
Second sample — selected units
X_3
Third sample — selected units
Δt
Sample interval — min
m
Three-point least-squares trend slope — units/min
b
Fitted value at middle sample — units

Engineering calculation disclaimer

These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.

Read the full use and limitation statement