Three-Point Trapezoidal Total Calculator

Integrate three equally spaced rate samples by the trapezoidal rule.

Why it matters: Transparent data reduction keeps raw values, criteria, symbols, and arithmetic available for review.

User inputs

Enter field measurements

6 inputs
The selected system is recorded with the calculation; these data-reduction equations are unit-neutral.
Enter the common unit label for the values, such as °F, psi, cfm, gpm, kW, or °C.
selected unitsRate at time zero.
selected unitsRate at one interval.
selected unitsRate at two intervals.
minEqual interval between samples.

Calculated result

Engineering evaluation

Calculation complete—verify project criteria
Trapezoidal integrated total (I)200 units·min

Engineering interpretation

The three equally spaced samples integrate to 200 units·min by the trapezoidal rule.

Important limitations

  • Data-reduction screen only. Project requirements, test procedure, instrument uncertainty, sampling, and authorized engineering judgment remain controlling.

Engineering knowledge center

Understand the calculation—not just the answer

2026-08-07 · Free Library
Governing relationships
I=Δt(X_1/2+X_2+X_3/2)
Current substitution

I=5×(10/2+20+30/2)=200.

Calculation sequence

Step-by-step method

  1. Confirm the measurement boundary, time basis, and formula symbols.
  2. Apply the displayed equation to the user-entered values.
  3. Review data quality, uncertainty, project criteria, and professional disposition.

Equation legend

Inputs and calculated quantities

X_1
First rate sample — selected units
X_2
Second rate sample — selected units
X_3
Third rate sample — selected units
Δt
Sample interval — min
I
Trapezoidal integrated total — units·min

Engineering calculation disclaimer

These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.