Calculation sequence
Step-by-step method
- Add supply and return duct-path losses.
- Add filter, coil, and other equipment losses.
- Add other documented external losses.
Sum entered external air-system component pressure losses on a consistent static-pressure basis.
Why it matters: A complete pressure budget helps identify missing components and compare fan capability with system resistance.
Calculated result
The entered external pressure budget totals 3 in. w.g.: 1.3 in. w.g. duct path, 1.6 in. w.g. equipment, and 0.1 in. w.g. other loss.
Engineering knowledge center
TESP = (0.8+0.5)+(0.6+0.7+0.3)+0.1 = 3 in. w.g..
Calculation sequence
Equation legend
Applications
Assemble a preliminary external static-pressure budget.
Track installed filter, coil, duct, fitting, and device losses.
Reconcile measured fan static pressure with component pressure losses.
Quality controls
Field use
Technical basis
These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.
Read the full use and limitation statement