Calculated result
Engineering evaluation Calculation complete—verify project criteria Annual lighting energy savings (ΔE) 12,000 kWh/year
Connected-demand reduction (ΔP) 4 kW
Energy-only cost savings (ΔC) 1,440 currency/year
Connected-power reduction (r) 40 % Engineering interpretation The screen yields 12000 kWh/year and 1440 currency units/year energy-only savings, with 40% connected-power reduction.
Important limitations Demand charges, HVAC interaction, maintenance, rebates, degradation, controls, schedules, capital cost, and lighting quality require separate review. Copy results Open printable PDF Download PDF
Report a calculation concern
Engineering knowledge center
Understand the calculation—not just the answer 2026-08-07 · Free Library Equations & method Engineering guide Reference data & sources
Governing relationships ΔP = (P₁−P₂)/1000
ΔE = ΔP·t
ΔC = ΔE·Rᵉ
r = 100(P₁−P₂)/P₁
Current substitution ΔP = (10000−6000)/1000 = 4 kW; ΔE = 4×3000 = 12000 kWh; ΔC = 1440; r = 40%.
Calculation sequence
Step-by-step method Subtract proposed connected power from existing power. Multiply kW reduction by equivalent annual hours. Apply the user-entered energy rate. Equation legend
Inputs and calculated quantities
P₁ Existing lighting power — W
P₂ Proposed lighting power — W
t Equivalent annual operating hours — h/year
Rᵉ Blended energy rate — currency/kWh
ΔE Annual lighting energy savings — kWh/year
ΔP Connected-demand reduction — kW
ΔC Energy-only cost savings — currency/year
r Connected-power reduction — % Applications
How this calculation is used Building design Screen a proposed lighting power reduction.
Construction Check fixture counts, wattages, and control assumptions.
Commissioning Compare verified existing and proposed power with equivalent annual hours.
Quality controls
Assumptions and limitations Assumptions Entered values describe one stable operating condition and use a consistent electrical or metering boundary. Measured quantities are simultaneous, representative, and obtained with appropriately rated instruments. Limitations Energy-only screen; demand, HVAC interaction, maintenance, rebates, degradation, and capital cost are omitted. Lighting quality, controls, schedules, and adopted-code requirements require project review. Field use
Verification procedure Follow the approved electrical-safety program and use correctly rated instruments. Confirm wiring, ratios, units, operating mode, and measurement boundaries. Document simultaneous readings and compare with approved project and manufacturer data. Common engineering mistakes Combining values from different time intervals, phases, or measurement boundaries. Treating a screening result as equipment selection, protective-device coordination, or code compliance. Technical basis
References and source standards Need project-specific support?
Work with SVE Group Use this free tool for preliminary evaluation and field support. For project requirements, system analysis, commissioning, or engineering services, connect with SVE Group.
Visit SVE Group Contact the firm Engineering calculation disclaimer These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.
Read the full use and limitation statement