Runtime and Cycling Calculator

Calculate runtime percentage, cycles per hour, and average on-time from an observation interval.

Why it matters: Excessive cycling can indicate oversizing, poor control, low load, or equipment problems.

User inputs

Enter field measurements

5 inputs
Select I-P or SI units. Unit-dependent entries are converted when the selection changes.
hTotal observed interval.
hEquipment on-time during the interval.
countStarts recorded during the interval.
1/hUser-entered manufacturer or project screening criterion; equipment type governs.

Calculated result

Engineering evaluation

Entered cycling criterion met
Runtime fraction (RF)50 %
Starts per hour (CPH)
0.5 1/h
Average on-time per start (Ton)
60 min/start

Engineering interpretation

The interval shows 50% runtime, 0.5 starts per hour, and 60 minutes average on-time per start. Entered maximum is 6 starts per hour.

Important limitations

  • Average metrics can conceal clustered cycling, lockouts, staging, mode changes, and trend gaps. Review the time series.

Engineering knowledge center

Understand the calculation—not just the answer

2026-08-07 · Free Library
Governing relationships
RF = Tr/Te×100
CPH = N/Te
Ton = Tr·60/N
compare CPH with CPHmax
Current substitution

RF = 12/24×100 = 50%; CPH = 12/24 = 0.5; Ton = 60 min/start; CPHmax = 6.

Calculation sequence

Step-by-step method

  1. Confirm elapsed interval, accumulated runtime, and start-count reset behavior.
  2. Divide runtime by elapsed interval.
  3. Compare starts per hour with the user-entered screening limit.

Equation legend

Inputs and calculated quantities

Te
Observation interval — h
Tr
Accumulated runtime — h
N
Number of starts — count
CPHmax
Entered maximum starts per hour — 1/h
RF
Runtime fraction — %
CPH
Starts per hour — 1/h
Ton
Average on-time per start — min/start

Engineering calculation disclaimer

These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.

Read the full use and limitation statement