Confirm elapsed interval, accumulated runtime, and start-count reset behavior.
Divide runtime by elapsed interval.
Compare starts per hour with the user-entered screening limit.
Equation legend
Inputs and calculated quantities
Te
Observation interval — h
Tr
Accumulated runtime — h
N
Number of starts — count
CPHmax
Entered maximum starts per hour — 1/h
RF
Runtime fraction — %
CPH
Starts per hour — 1/h
Ton
Average on-time per start — min/start
Applications
How this calculation is used
Building design
Screen staging and part-load expectations.
Construction
Check status points and start counters.
Commissioning
Summarize equipment cycling from trend or counter data against a user-entered screening limit.
Quality controls
Assumptions and limitations
Assumptions
Entered data describe one stable operating condition and use consistent measurement boundaries.
Time, energy, and performance values are representative of the stated interval.
Limitations
This is a preliminary evaluation and commissioning-support tool, not an automatic acceptance determination.
Project sequences, manufacturer data, tariffs, codes, and professional review remain controlling.
Field use
Verification procedure
Confirm the operating mode, test boundary, and instrument calibration.
Collect simultaneous readings or a documented trend interval.
Compare the result with the approved sequence, submittal, and project criteria.
Common engineering mistakes
Combining measurements from different operating modes or time intervals.
Ignoring sensor uncertainty, trend sampling, or the defined equipment boundary.
Technical basis
References and source standards
ASHRAE Handbook—HVAC Systems and EquipmentHVAC equipment, central-plant, air-system, and control-performance context; verify the licensed current edition during professional review.
These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.