Calculated result
Engineering evaluation Calculation complete—verify project criteria Demand factor (DF) 60 %
Average demand (Pᵃᵛᵍ) 300 kW
Load factor (LF) 50 % Engineering interpretation The entered period gives 60% demand factor, 300 kW average demand, and 50% load factor.
Important limitations Billing demand and utility ratchets may use different definitions. Copy results Open printable PDF Download PDF
Report a calculation concern
Engineering knowledge center
Understand the calculation—not just the answer 2026-08-07 · Free Library Equations & method Engineering guide Reference data & sources
Governing relationships DF = 100Pᵈ/Pᶜ
Pᵃᵛᵍ = E/t
LF = 100Pᵃᵛᵍ/Pᵈ
Current substitution DF = 100×600/1000 = 60%; Pᵃᵛᵍ = 216000/720 = 300 kW; LF = 50%.
Calculation sequence
Step-by-step method Divide peak demand by connected load. Divide interval energy by interval duration. Divide average demand by peak demand. Equation legend
Inputs and calculated quantities
Pᶜ Connected load — kW
Pᵈ Measured peak demand — kW
E Interval energy — kWh
t Interval duration — h
DF Demand factor — %
Pᵃᵛᵍ Average demand — kW
LF Load factor — % Applications
How this calculation is used Building design Screen entered load and demand relationships.
Construction Check meter interval and connected-load boundaries.
Commissioning Reconcile interval energy with peak and connected demand.
Quality controls
Assumptions and limitations Assumptions Entered values describe one stable operating condition and use a consistent electrical or metering boundary. Measured quantities are simultaneous, representative, and obtained with appropriately rated instruments. Limitations Does not determine billing demand or utility ratchets. Metering interval, coincident demand, and connected-load scope must be documented. Field use
Verification procedure Follow the approved electrical-safety program and use correctly rated instruments. Confirm wiring, ratios, units, operating mode, and measurement boundaries. Document simultaneous readings and compare with approved project and manufacturer data. Common engineering mistakes Combining values from different time intervals, phases, or measurement boundaries. Treating a screening result as equipment selection, protective-device coordination, or code compliance. Technical basis
References and source standards Need project-specific support?
Work with SVE Group Use this free tool for preliminary evaluation and field support. For project requirements, system analysis, commissioning, or engineering services, connect with SVE Group.
Visit SVE Group Contact the firm Engineering calculation disclaimer These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.
Read the full use and limitation statement