Calculated result
Engineering evaluation Screening estimate—demand and TOU excluded Estimated blended-energy cost savings (Sav) 9,600 currency/year (energy only)
Baseline energy (Eb) 400,000 kWh/year
Proposed energy (Ep) 320,000 kWh/year
Baseline energy-only cost (Cb) 48,000 currency/year
Proposed energy-only cost (Cp) 38,400 currency/year Engineering interpretation The entered blended energy-rate comparison yields estimated annual energy-only savings of 9600 currency units.
Important limitations Demand charges, ratchets, time-of-use rates, taxes, maintenance, escalation, interactions, persistence, and capital cost are excluded. Copy results Open printable PDF Download PDF
Report a calculation concern
Engineering knowledge center
Understand the calculation—not just the answer 2026-08-07 · Free Library Equations & method Engineering guide Reference data & sources
Governing relationships Eb = Pb·t
Ep = Pp·t
Cb = Eb·R
Cp = Ep·R
Sav = Cb−Cp
Current substitution Eb = 100×4000 = 400000; Ep = 80×4000 = 320000; Sav = 48000−38400 = 9600.
Calculation sequence
Step-by-step method Calculate baseline and proposed annual energy. Multiply each by the entered blended energy rate. Subtract proposed energy-only cost from baseline energy-only cost. Equation legend
Inputs and calculated quantities
Pb Baseline input power — kW
Pp Proposed input power — kW
t Annual operating hours — h/year
R Blended energy rate — currency/kWh
Sav Estimated blended-energy cost savings — currency/year (energy only)
Eb Baseline energy — kWh/year
Ep Proposed energy — kWh/year
Cb Baseline energy-only cost — currency/year
Cp Proposed energy-only cost — currency/year Applications
How this calculation is used Building design Compare operating alternatives.
Construction Check metering and sequence assumptions.
Commissioning Estimate annual energy and cost difference from field power data.
Quality controls
Assumptions and limitations Assumptions Entered data describe one stable operating condition and use consistent measurement boundaries. Time, energy, and performance values are representative of the stated interval. Limitations This is a preliminary evaluation and commissioning-support tool, not an automatic acceptance determination. Project sequences, manufacturer data, tariffs, codes, and professional review remain controlling. Field use
Verification procedure Confirm the operating mode, test boundary, and instrument calibration. Collect simultaneous readings or a documented trend interval. Compare the result with the approved sequence, submittal, and project criteria. Common engineering mistakes Combining measurements from different operating modes or time intervals. Ignoring sensor uncertainty, trend sampling, or the defined equipment boundary. Technical basis
References and source standards Need project-specific support?
Work with SVE Group Use this free tool for preliminary evaluation and field support. For project requirements, system analysis, commissioning, or engineering services, connect with SVE Group.
Visit SVE Group Contact the firm Engineering calculation disclaimer These engineering tools are provided for educational, preliminary evaluation, field verification, and commissioning support. Results depend on the accuracy of user-entered information and the assumptions stated for each calculation. Every colored status and comparison is a screening indicator only; project criteria, contract requirements, applicable codes, manufacturer instructions, measurement uncertainty, and authorized engineering judgment govern. The tools do not replace project-specific engineering analysis or the judgment of a licensed professional engineer.
Read the full use and limitation statement